Search found 11 matches

by Jarda
Mon Jan 20, 2020 1:14 pm
Forum: Hardware
Topic: Maxi Power pinout
Replies: 2
Views: 26

Re: Maxi Power pinout

Hello,
the UART connection shall be the same like on the MAXI Automation.
Serial 2 is the best solution. We are still working on the new version of documentation, but pinheader is compatible with Standard MAXI.

Regards
Jarda
by Jarda
Mon Jan 20, 2020 12:52 pm
Forum: Hardware
Topic: PIN HEADER
Replies: 1
Views: 54

Re: PIN HEADER

Hello, pinheader is exactly for your application 😊. Yes, you can take power from pinheader and also connect the interrupt on the pinheader. Please only take care about the limitation on the pinheader (maximum output current and serial protection resistances which shall be no problem in your applicat...
by Jarda
Mon Jan 20, 2020 12:45 pm
Forum: Questions & Troubleshooting
Topic: PWM output
Replies: 1
Views: 216

Re: PWM output

Hello, PWM outputs located at the screw terminals are related to the input voltage. If you need 5V only, you can use signals on the pinheader. Only please take into the account the implemented series resistance located to every pin on the pinheader. So connected capacitance must be low (or use some ...
by Jarda
Mon Jan 20, 2020 12:39 pm
Forum: Hardware
Topic: Pzem 004t energy module
Replies: 1
Views: 244

Re: Pzem 004t energy module

Dear Giovanni, Serial 1 has higher protection resistances. When you use Serial 2 and it is working, we propose to use Serial 2. The other I/Os with lower impedances are SPI lines (be careful here because the SPI is shared), or you can use pins common with Outputs where is also protection impedance l...
by Jarda
Mon May 20, 2019 4:04 pm
Forum: Software & Firmware
Topic: Digital outputs
Replies: 1
Views: 447

Re: Digital outputs

Hi Tomas,
no, it is not possible without the external component. DO is realised by high side switch tied to CONTROLLINO input voltage.
For AC I would prefer to use relay output, which is also presented on CONTROLLINO ;).

Best Regards
Jarda
by Jarda
Mon May 06, 2019 1:21 pm
Forum: Hardware
Topic: CONTROLLINO MINI - 5V and 3V pins current
Replies: 1
Views: 386

Re: CONTROLLINO MINI - 5V and 3V pins current

Hello zanellato, yes, power pins on pinheader are limited to 200 mA in total, not every pin. 3V3 peripheral will not work because ATMEGA2560 is powered from 5V and will not work with 3V3 level device even when device is tolerant. In case of input, level for processor will be too low. When you will u...
by Jarda
Wed Apr 03, 2019 7:02 am
Forum: Hardware
Topic: Question about Digital Output. 12V or 24v?
Replies: 1
Views: 458

Re: Question about Digital Output. 12V or 24v?

Hi Elok,
outputs are related to CONTROLLINO input voltage. If you have 12V, you have 12V at output, if you have 24V you have 24V. According controlining the outputs itself, please use example sketch at IDE.

Regards
Jarda
by Jarda
Mon Mar 25, 2019 2:58 pm
Forum: Setup & Installation
Topic: Controllino MINI documentation
Replies: 2
Views: 731

Re: Controllino MINI documentation

Hello Puggy, the HW of the CONTROLLINO is not open source, you can find all needed information at https://www.controllino.biz/downloads/#manuals including description which peripheral is connected to which port. About using of the PWM, you can use standard PWM sketch from Aurduino, it shall work. Al...
by Jarda
Mon Mar 25, 2019 12:50 pm
Forum: Hardware
Topic: Flyback diode on screwrail digital inputs?
Replies: 2
Views: 518

Re: Flyback diode on screwrail digital inputs?

Dear jathanas, I think you have mixed up the inputs/outputs in the topic and real question ;). If you are talking about screw terminal outputs and possibility to switch ON the inductive load then yes, you can use direct connection to the relay. Screw terminal outputs are realised in the way, that it...
by Jarda
Tue Mar 19, 2019 3:40 pm
Forum: Projects
Topic: Firefighter House Door Control
Replies: 0
Views: 992

Firefighter House Door Control

We have used CONTROLLINO MAXI for the firefighter house door control. Device receives SMS from the central emergency system together with voluntary firefighter team, unlock the door for short time to be able to enter the building, switch light in the house and measure and show the "action time". On ...